How to properly pour a foundation for a fence and how not to do it
Choosing formwork for the foundation for a fence If the fence is made of stone and reinforced concrete formwork
small panel formwork
Small panel formwork: device, dimensions, installation
Small panel formwork is a type of formwork for monolithic construction. It consists of a steel frame
How long should the foundation stand after pouring - the duration of standing
Foundation of the house After a long, harsh winter, the active construction season begins. Unfortunately, construction is not
How to prepare 1 cube of concrete - calculating the amount of 4 components
Construction is a labor-intensive and scrupulous process. At the initial stage, you should select the composition
Methods for draining water from the foundation of a house
Discharge of surface and ground water. We are building a drainage system for a private house
Methods for draining water from the foundation of a house A foundation is a support, the foundation of a permanent structure. From
How to properly insulate the foundation and blind area with foam plastic from the outside
Features of the material used Cleaning and leveling the foundation before insulation Preliminary protection of the foundation from moisture
Foundation formwork: how to install it yourself
When constructing a monolithic foundation, it is very important to correctly position the formwork - the structure must create a rigid shape
Formwork boards are the basis of monolithic construction
October 17, 2020 Stroyexpert Home page » Foundation » Materials and equipment Boards for
What should be the width of interior doors - advice from professionals
01/6/2016 (Updated: 07/15/2020) Vladimir Stolbov 9 minutes Usability 84 33 28 23 In the article we
Distance from water supply to foundation and sewerage requirements and standards
Engineering design of houses, helps to develop solutions for the placement of heating, water supply, sewerage, ventilation and
Для любых предложений по сайту: [email protected]